Sale!

5mm RGB Tri-Color (Red Green Blue Multicolor) 4Pin LED Diodes Common Cathode Diffused Round Lens 29mm Long Lead, Light Emitting Diodes

Original price was: ₨299.Current price is: ₨149.

  • Low Energy Consumption And Low Heat.
  • Industrial Standard Size,29mm Long Lead for widely used and convenient for operation.
  • Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
  • Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
  • Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.
Guaranteed Safe Checkout
_x000D_

  • RGB LED In Pakistan

_x000D_

  • RGB LED FOR ARDUINO

_x000D_

  • PC AND RASPBERRY PI-

_x000D_

  • Arduino 3-color

_x000D_

  • LED – With red, green and blue output

_x000D_

  • Great for DIY project

_x000D_

  • Low Energy Consumption And Low Heat.
  • Industrial Standard Size,29mm Long Lead for widely used and convenient for operation.
  • Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
  • Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
  • Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.
Weight 0.2 kg
Dimensions 9 × 8 × 2 cm

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

5mm RGB Tri-Color (Red Green Blue Multicolor) 4Pin LED Diodes Common Cathode Diffused Round Lens 29mm Long Lead, Light Emitting Diodes5mm RGB Tri-Color (Red Green Blue Multicolor) 4Pin LED Diodes Common Cathode Diffused Round Lens 29mm Long Lead, Light Emitting Diodes
Original price was: ₨299.Current price is: ₨149.
Scroll to Top