-
RGB LED In Pakistan
_x000D_
-
RGB LED FOR ARDUINO
_x000D_
-
PC AND RASPBERRY PI-
_x000D_
-
Arduino 3-color
_x000D_
-
LED – With red, green and blue output
_x000D_
-
Great for DIY project
_x000D_
-
Low Energy Consumption And Low Heat.
-
Industrial Standard Size,29mm Long Lead for widely used and convenient for operation.
-
Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
-
Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
-
Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.











Reviews
There are no reviews yet.